Close Menu
NERDBOT
    Facebook X (Twitter) Instagram YouTube
    Subscribe
    NERDBOT
    • News
      • Reviews
    • Movies & TV
    • Comics
    • Gaming
    • Collectibles
    • Science & Tech
    • Culture
    • Nerd Voices
    • About Us
      • Join the Team at Nerdbot
    NERDBOT
    Home»Technology»Field Construction Management Software
    Unsplash
    Technology

    Field Construction Management Software

    Nerd VoicesBy Nerd VoicesAugust 18, 20213 Mins Read
    Share
    Facebook Twitter Pinterest Reddit WhatsApp Email

    Most recently, we made a presentation “Three software products for construction project management” at a BIM breakfast. The organizers were the guys from BIM.by. During a short 20-minute report, Alexander Koltsov spoke about his personal experience of using programs for managing construction projects and construction estimating.

    Trello for task flow management 

    Oracle Primavera for large and unique projects requiring critical path management.

    Own development that allows you to control the cost of a construction project and unite the work of departments.

    You can download the pdf-version of the presentation using the link. The slides and the presentation itself can be scrolled below.

    I want to tell you about three software products that I personally used in application to the construction topic. All of these products are very different, but complement each other perfectly. I’ll start with perhaps the simplest and most convenient, in my opinion, Trello and its field service management software.

    Trello – Kanban-based task management software

    Those of you who have worked in the IT field or have a close relationship with it probably know about Kanban. If not, then I will briefly tell you what it is.

    In my case, we used Kanban to:

    • management of work on the preparation of commercial proposals (fire alarm systems);
    • load management of “narrow” specialists: buyer, estimator;
    • management of the recruitment process;
    • control of payment of invoices;
    • control of the decision of organizational issues that do not relate to a specific construction site, but nevertheless require management.

    Specifically, Trello is convenient in that:

    • allows you to run multiple independent boards;
    • create independent teams (only VET, the whole organization, only top managers, etc.);
    • allows employees to easily communicate inside the card (comments, notifications, documents, checklists, etc.);
    • completely free.

    Link to the invitation.

    Applicability of Kanban Board:

    • tasks require stage management;
    • tasks with a large number of communications with related departments;
    • tasks of a specific employee, who is the “bottleneck” in the company.

    Kanban does not work if:

    • you need calendar-networking logic. Oracle Primavera, MS Project Server or similar will do.
    • you need to evaluate resource loading. Other solutions are also required.
    • you need to manage the cost. Choose a different product.

    Oracle Primavera for Complex Project Management

    I have already talked about this software product in detail many times. In general, a strong platform that allows you to manage resources, deadlines, cost of a complex and unique project.

    It is clearly seen that the program allows:

    • decompose the project into parts (WBS) and tasks;
    • describe each task with additional parameters (labor intensity, predecessors and followers, time limits, etc.);
    • build a calendar-network model (critical path method);
    • assess the project’s need for funding, etc.

    Primavera is a strong software product that can solve complex problems, but there are several limitations that I have identified in practice:

    • you need to have all the necessary information about the construction object (estimates, drawings, resource production, a list of contractors, etc.). This is often not possible.
    • you need to constantly work and maintain the integrity and relevance of the work schedule. This is a titanic work, believe me. If the company does not have qualified network schedulers, then this work will die out in a month or even earlier.
    • it is very difficult to get an organization to use the results that Primavera provides. This is not a problem with the product itself, but it nevertheless means that you most likely will not be able to “turn it on and get the result”.

    No matter which you choose you will want to make sure you get good professional estimates before starting with one. Good luck and choose wisely!

    Do You Want to Know More?

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Email
    Previous ArticleCybersecurity Awareness in Gaming -2021
    Next Article Hasbro Launches “Aliens” M41A Pulse Rifle as Nerf Foam Blaster!!
    Nerd Voices

    Here at Nerdbot we are always looking for fresh takes on anything people love with a focus on television, comics, movies, animation, video games and more. If you feel passionate about something or love to be the person to get the word of nerd out to the public, we want to hear from you!

    Related Posts

    Dr. Nazmi Baycin Announces Mia Femtech Cost in Dubai

    July 3, 2025

    Tech on the Table: Digital Tools Aussie Restaurants Need to Stay Ahead

    July 3, 2025

    What Is the Dawlance 1.5 Ton AC Price in Pakistan at Lahore Centre?

    July 3, 2025

    ZEE5 Presents Ata Thambaycha Naay – A Power-Packed Marathi Thriller You Can’t Miss!

    July 3, 2025

    Elevating Digital Commerce with Custom E Commerce and Retail Software Development

    July 3, 2025

    Magento Pricing for 2025: How Much Does Magento Cost? 

    July 3, 2025
    • Latest
    • News
    • Movies
    • TV
    • Reviews
    Automated Hollow Fiber Spinning Machine for Membrane Production

    Automated Hollow Fiber Spinning Machine for Membrane Production

    July 3, 2025
    Exploring the Benefits of CPAP Therapy

    Exploring the Benefits of CPAP Therapy

    July 3, 2025
    Why Membrane Cutter is Essential in Lateral Flow Manufacturing

    Why Membrane Cutter is Essential in Lateral Flow Manufacturing

    July 3, 2025
    A Step-by-Step Guide to the Conveyancing Process in Sydney

    A Step-by-Step Guide to the Conveyancing Process in Sydney

    July 3, 2025

    The F11PRO 2 Drone – Pro-Level Performance Meets Sleek Design

    July 3, 2025

    President Trump Will “Look” at Deporting Elon Musk

    July 2, 2025

    Revitalize Your Mind and Body: How New Image Wellness Transforms Mental Well-being

    July 2, 2025

    Netflix to Stream NASA Launches, Missions, and More

    June 30, 2025

    “Reservoir Dogs” Star Michael Madsen has Passed Away

    July 3, 2025

    Marisa Abela Joins Chad Stahelski’s “Highlander”

    July 2, 2025

    Marvel Studios Reveals BTS Look at “The Fantastic Four”

    July 2, 2025

    David Dastmalchian to Play M. Bison in “Street Fighter”

    July 1, 2025

    “Trainwreck: Storm Area 51” Gets Teaser for Netflix Docu

    July 2, 2025

    Neil Druckmann Leaves HBO’s “Last of Us” Ahead of Season 3

    July 2, 2025

    First Look at Chatsubo Bar from Apple TV+’s “Neuromancer” Series

    July 1, 2025
    “The Tiny Chef Show”

    “Tiny Chef Show” Raises $80k After Nickelodeon Cancelation

    June 28, 2025

    The F11PRO 2 Drone – Pro-Level Performance Meets Sleek Design

    July 3, 2025
    "M3GAN," 2025

    “M3GAN 2.0” A Sequel That Forgets to Have Fun [Review]

    June 29, 2025

    “F1: The Movie” Thrilling Cars, Crash and Burn Story [Review]

    June 28, 2025

    “28 Years Later” We Live, We Die, Life Goes On [Review]

    June 21, 2025
    Check Out Our Latest
      • Product Reviews
      • Reviews
      • SDCC 2021
      • SDCC 2022
    Related Posts

    None found

    NERDBOT
    Facebook X (Twitter) Instagram YouTube
    Nerdbot is owned and operated by Nerds! If you have an idea for a story or a cool project send us a holler on [email protected]

    Type above and press Enter to search. Press Esc to cancel.